System Online
|60 DERs Connected
21
Not signed in
Fleet

Batangas Combined Cycle Plant

Batangas City, Batangas · 414 MW · commissioned 2002 · AboitizPower — Thermal

PARTIAL
Grid Interface
Reactive power
45.6 MVAr
capacitive (voltage support)
Power factor
0.980
meets grid code
Available capacity
414.0 MW
198.7 MW headroom
Dispatch state
Curtailed
48% below capability
Asset Overview
Location
Batangas
Batangas City, Batangas
Nameplate
414 MW
Current output
215.3 MW
52% of rated
Capacity factor
46%
Fuel
Natural Gas
pipeline supply
Heat rate
7,100
kJ/kWh
Thermal efficiency
50.7%
Ramp rate
24.8 MW/min
min load 124.2 MW

Emissions Monitoring

Continuous emissions vs. DENR permit limits

NOx119.8 / 500 mg/Nm³
24% of permit limit
SOx13.1 / 700 mg/Nm³
1.9% of permit limit
Particulate7.4 / 150 mg/Nm³
4.9% of permit limit
88.3 t/h
CO₂ emission rate
410 kg/MWh
CO₂ intensity

Generation Trend

Batangas Combined Cycle Plant · 192 MW avg

Generating Units

3 boiler-turbine-generator units

UnitStatusRatedOutputSteam °CPressureSteam FlowEfficiency
Unit 1Running138 MW
109.7 MW
538.4°169.5 bar340.1 t/h42.2%
Unit 2Running138 MW
109.7 MW
539.2°169.5 bar340.1 t/h41.5%
Unit 3Standby138 MW
0 MW
150.5°5.7 bar0 t/h0%