Fleet
Batangas Combined Cycle Plant
Batangas City, Batangas · 414 MW · commissioned 2002 · AboitizPower — Thermal
PARTIAL
Grid Interface
Reactive power
45.6 MVAr
capacitive (voltage support)
Power factor
0.980
meets grid code
Available capacity
414.0 MW
198.7 MW headroom
Dispatch state
Curtailed
48% below capability
Asset Overview
Location
Batangas
Batangas City, Batangas
Nameplate
414 MW
Current output
215.3 MW
52% of rated
Capacity factor
46%
Fuel
Natural Gas
pipeline supply
Heat rate
7,100
kJ/kWh
Thermal efficiency
50.7%
Ramp rate
24.8 MW/min
min load 124.2 MW
Emissions Monitoring
Continuous emissions vs. DENR permit limits
NOx119.8 / 500 mg/Nm³
24% of permit limit
SOx13.1 / 700 mg/Nm³
1.9% of permit limit
Particulate7.4 / 150 mg/Nm³
4.9% of permit limit
88.3 t/h
CO₂ emission rate
410 kg/MWh
CO₂ intensity
Generation Trend
Batangas Combined Cycle Plant · 192 MW avg
Generating Units
3 boiler-turbine-generator units
| Unit | Status | Rated | Output | Steam °C | Pressure | Steam Flow | Efficiency |
|---|---|---|---|---|---|---|---|
| Unit 1 | Running | 138 MW | 109.7 MW | 538.4° | 169.5 bar | 340.1 t/h | 42.2% |
| Unit 2 | Running | 138 MW | 109.7 MW | 539.2° | 169.5 bar | 340.1 t/h | 41.5% |
| Unit 3 | Standby | 138 MW | 0 MW | 150.5° | 5.7 bar | 0 t/h | 0% |