Fleet
Therma Mindanao (PHIVIDEC) Plant
Villanueva, Misamis Oriental · 405 MW · commissioned 2017 · AboitizPower — Thermal
MAINTENANCE
Grid Interface
Reactive power
61.8 MVAr
capacitive (voltage support)
Power factor
0.960
meets grid code
Available capacity
270.0 MW
47.2 MW headroom
Dispatch state
Free run
output near capability
Asset Overview
Location
Misamis Oriental
Villanueva, Misamis Oriental
Nameplate
405 MW
Current output
222.8 MW
55% of rated
Capacity factor
74%
Fuel
Coal
18.3 days stock
Heat rate
9,300
kJ/kWh
Thermal efficiency
38.7%
Ramp rate
4.9 MW/min
min load 182.3 MW
Emissions Monitoring
Continuous emissions vs. DENR permit limits
NOx440.6 / 1000 mg/Nm³
44.1% of permit limit
SOx425 / 700 mg/Nm³
60.7% of permit limit
Particulate77.5 / 150 mg/Nm³
51.6% of permit limit
211.7 t/h
CO₂ emission rate
950 kg/MWh
CO₂ intensity
Generation Trend
Therma Mindanao (PHIVIDEC) Plant · 303 MW avg
Generating Units
3 boiler-turbine-generator units
| Unit | Status | Rated | Output | Steam °C | Pressure | Steam Flow | Efficiency |
|---|---|---|---|---|---|---|---|
| Unit 1 | Running | 135 MW | 114.3 MW | 539° | 170.2 bar | 354.3 t/h | 42.6% |
| Unit 2 | Running | 135 MW | 109.6 MW | 544.3° | 169.7 bar | 339.8 t/h | 42% |
| Unit 3 | Maintenance | 135 MW | 0 MW | 163.9° | 0 bar | 0 t/h | 0% |