System Online
|60 DERs Connected
21
Not signed in
Fleet

Ambuklao Hydroelectric Plant

Bokod, Benguet · 105 MW · commissioned 1956 · AboitizPower — Hydro

RUNNING
Grid Interface
Reactive power
10.3 MVAr
capacitive (voltage support)
Power factor
0.980
meets grid code
Available capacity
98.7 MW
40.9 MW headroom
Dispatch state
Curtailed
41% below capability
Asset Overview
Location
Benguet
Bokod, Benguet
Nameplate
105 MW
Current output
57.8 MW
55% of rated
Capacity factor
41%
Net head
113.7 m
121 m gross
Reservoir level
747.7 MASL
64% of band
Turbine flow
57.5 m³/s
104.6 m³/s design
Hydro type
reservoir
3 units
Spill flow
0 m³/s
no overflow
Stored energy
27,139 MWh
reservoir equivalent

Reservoir Level — 30 days

Current 747.7 MASL · 64% of operating band

Spillway Min / Max

Generation Trend

Ambuklao Hydroelectric Plant · 43 MW avg

Generating Units

3 turbine-generator units

UnitTurbineStatusRatedOutputGateRPMEfficiencyBearing °C
Unit 1FrancisRunning35 MW
18.5 MW
66.7%30090.9%57.8°
Unit 2FrancisRunning35 MW
18.2 MW
66.2%30092.1%58°
Unit 3FrancisRunning35 MW
19 MW
67.6%30092.2%60.7°