System Online
|60 DERs Connected
21
Not signed in
Fleet

Bakun Hydroelectric Plant

Bakun, Benguet · 70 MW · commissioned 2001 · AboitizPower — Hydro

RUNNING
Grid Interface
Reactive power
12.4 MVAr
capacitive (voltage support)
Power factor
0.970
meets grid code
Available capacity
65.8 MW
14.0 MW headroom
Dispatch state
Curtailed
21% below capability
Asset Overview
Location
Benguet
Bakun, Benguet
Nameplate
70 MW
Current output
51.8 MW
74% of rated
Capacity factor
52%
Net head
573.4 m
610 m gross
Reservoir level
984 MASL
80% of band
Turbine flow
10.2 m³/s
13.8 m³/s design
Hydro type
run of river
3 units
Spill flow
0 m³/s
no overflow
Stored energy
2,125 MWh
reservoir equivalent

Reservoir Level — 30 days

Current 984 MASL · 80% of operating band

Spillway Min / Max

Generation Trend

Bakun Hydroelectric Plant · 36 MW avg

Generating Units

3 turbine-generator units

UnitTurbineStatusRatedOutputGateRPMEfficiencyBearing °C
Unit 1PeltonRunning23.3 MW
16.7 MW
78%60090.4%62.2°
Unit 2PeltonRunning23.3 MW
18.2 MW
81.9%60091.8%64.3°
Unit 3PeltonRunning23.3 MW
17.2 MW
79.3%60091.2%63.3°