System Online
|60 DERs Connected
21
Not signed in
Fleet

Manolo Fortich Hydroelectric Plant

Manolo Fortich, Bukidnon · 68.8 MW · commissioned 2022 · AboitizPower — Hydro

MAINTENANCE
Grid Interface
Reactive power
3.6 MVAr
capacitive (voltage support)
Power factor
0.990
meets grid code
Available capacity
43.1 MW
15.6 MW headroom
Dispatch state
Free run
output near capability
Asset Overview
Location
Bukidnon
Manolo Fortich, Bukidnon
Nameplate
68.8 MW
Current output
27.5 MW
40% of rated
Capacity factor
54%
Net head
184.2 m
196 m gross
Reservoir level
412.9 MASL
73% of band
Turbine flow
16.9 m³/s
42.3 m³/s design
Hydro type
run of river
3 units
Spill flow
0 m³/s
no overflow
Stored energy
588 MWh
reservoir equivalent

Reservoir Level — 30 days

Current 412.9 MASL · 73% of operating band

Spillway Min / Max

Generation Trend

Manolo Fortich Hydroelectric Plant · 37 MW avg

Generating Units

3 turbine-generator units

UnitTurbineStatusRatedOutputGateRPMEfficiencyBearing °C
Unit 1FrancisRunning22.9 MW
13.9 MW
71.4%30089.3%62.6°
Unit 2FrancisRunning22.9 MW
13.9 MW
71.4%30089.3%60.9°
Unit 3FrancisMaintenance22.9 MW
0 MW
0%00%27.2°