Fleet
Manolo Fortich Hydroelectric Plant
Manolo Fortich, Bukidnon · 68.8 MW · commissioned 2022 · AboitizPower — Hydro
MAINTENANCE
Grid Interface
Reactive power
3.6 MVAr
capacitive (voltage support)
Power factor
0.990
meets grid code
Available capacity
43.1 MW
15.6 MW headroom
Dispatch state
Free run
output near capability
Asset Overview
Location
Bukidnon
Manolo Fortich, Bukidnon
Nameplate
68.8 MW
Current output
27.5 MW
40% of rated
Capacity factor
54%
Net head
184.2 m
196 m gross
Reservoir level
412.9 MASL
73% of band
Turbine flow
16.9 m³/s
42.3 m³/s design
Hydro type
run of river
3 units
Spill flow
0 m³/s
no overflow
Stored energy
588 MWh
reservoir equivalent
Reservoir Level — 30 days
Current 412.9 MASL · 73% of operating band
Spillway Min / Max
Generation Trend
Manolo Fortich Hydroelectric Plant · 37 MW avg
Generating Units
3 turbine-generator units
| Unit | Turbine | Status | Rated | Output | Gate | RPM | Efficiency | Bearing °C |
|---|---|---|---|---|---|---|---|---|
| Unit 1 | Francis | Running | 22.9 MW | 13.9 MW | 71.4% | 300 | 89.3% | 62.6° |
| Unit 2 | Francis | Running | 22.9 MW | 13.9 MW | 71.4% | 300 | 89.3% | 60.9° |
| Unit 3 | Francis | Maintenance | 22.9 MW | 0 MW | 0% | 0 | 0% | 27.2° |